Main Storage Tank Replacement at an Active Healthcare Facility fuel system
tank replacements

Main Storage Tank Replacement at an Active Healthcare Facility

Facility Type

Regional Healthcare Facility

Location

Greater Toronto Area

Main Storage Tank Replacement at an Active Healthcare Facility completed installation
Fig 1. Final installation showing clean steel fuel piping, supports, and containment, executed to TSSA standards.

Project Scope

Temporary fuel provisioning, tank removal coordination, new base pad, custom fabrication of protective bollards.

The Challenge

Underground tank nearing end of life requiring replacement with a double-wall aboveground unit.

In critical facilities, fuel system deficiencies pose an immediate risk to life-safety operations. Prolonged downtime during remediation is rarely an option, requiring precise planning and execution.

The Solution & Execution

Our team developed a comprehensive execution plan that prioritized maintaining backup power readiness while the new systems were installed.

  • Detailed site assessment to verify routing and clearances
  • Custom fabrication of required supports off-site
  • Coordinated shutdown and transfer sequencing
  • Final testing, commissioning and TSSA compliance documentation

Project Result

Seamless transition ensuring life-safety power remained continuously available throughout the project.